

The challenge in the project
MOULIN DU COUVENT, which specialises in high quality smoked fish, all of which is handmade for major names in the catering sector. When they were looking for new premises more suited to their business, they approached CECIA to work with them. The new building had to fit in with the hygiene standards in the sector and at the same time suit its development needs.
Our response
The teams at CECIA worked with MOULIN DU COUVENT when they thought about what they required for their new premises. After a few studies on the reorganisation and restructuring of the existing sites, they finally decided to build a new project. The in-house design team at CECIA carried out all the studies taking into account the client’s needs, involving in particular the handmade aspect, the management of movements and the choice of materials and coverings. A few measures were also put in place to save energy, such as the installation of heat pumps to recover thermal energy from the factory and the installation of solar panels to produce hot water for the premises. It took nine months to erect the 2280 m² operation.
Technical features
Type of building
Agri-food factoryCity
Descartes (37)State of the project
BuiltBuilt surface
2395
Our other construction projects
Production units, warehouses, offices: take a look at all the turnkey projects we have designed for our clients.
News and advice
News and our skills
See our latest news and get advice from our experts to build your project in the best possible conditions.
Follow us on social networks to keep up to date with our latest news.